INA - NINEVEH Nineveh Bridges directorate launched reconstruction works of the third bridge in Mosul. Director of Roads and Bridges told INA, that the launching in cooperation with the engineering company in Baghdad. The rehabilitated bridge connects west and east sides of Mosul, within a timetable not to exceed 6 months to be accomplished. Translated by: Linda Edward Edited by: Shahad J Hassan
US Central Command: We killed ISIS terrorist leader Abu Yusuf in Syria
Liverpool compete with Real Madrid to sign Olympique Lyonnais star
Iraq assumes presidency of Arab Investment Company’s Executive Board
Hackers exploiting Microsoft Teams to gain remote access to user’s system